HOW ROLLABLE FIBER RIBBONS SUPPORT MODERN BROADBAND NETWORKS

Understanding the intermittent bonded ribbon production line

Equipment for producing rollable formats in optical-fiber manufacturing is supplied by Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. Buyers can compare the capacity of this setup against their intended product range because it is designed for 12- and 16-fiber ribbons. Its split-type construction may also affect factory space and installation requirements.




The stated construction speed for this particular production line is 600 m/min. Fiber pay-off, gathering and guiding, intermittent resin dispensing, UV-LED curing, visual monitoring, capstan pulling, and take-up are integrated in the process. When assessing suitability, the complete process matters rather than speed alone.

Before purchasing, check factory utilities, reel requirements, available floor space, and installation conditions. Ask the supplier for its documentation package and confirm the system’s suitability for your cable design and operating requirements. Early planning for these details can minimize setup delays and make startup smoother.

Main Takeaways

  • Designed for rollable 12- and 16-fiber formats.
  • Specified equipment speed: 600 m/min.
  • Features a split-type construction.
  • Includes curing, monitoring, pulling, and take-up stages.
  • Before purchasing, verify utilities, reels, installation requirements, and supplier documentation.

Intermittent Bonded Ribbon Production LineIntermittent Bonded Ribbon Production Line

Explore The Intermittent Bonded Ribbon Production Line

Three mold groups help form rollable IBR formats by positioning fibers for small adhesive dots. Mold position is adjustable by operators from 0 to 15 mm, helping maintain consistent spacing and form.

Make Rollable Fiber Ribbons Using Precision Bonding

A 16-spool pay-off feeds the machine, while guide rollers with U-shaped grooves keep individual strands organized. Steady contact during processing is supported by the rollers’ hard-anodized surfaces. For 12F and 16F layouts, the adjustable valve setup uses 5+5+1 valves for 12 fibers or 5+5+5 for 16. Ask the supplier to verify tension control settings that suit your particular cable design.

Run 12- And 16-Fiber Configurations At Up To 600 m/min

The stated construction speed reaches 600 m/min. The listed reel dimensions, Φ236 mm × Φ25.4 mm × 108 mm and Φ267 mm × Φ25.4 mm × 180 mm, correspond to pay-off reel options holding 25.2 km or 50.4 km of fiber. T-type and fiber-optic take-up reels are also offered for this system. Compare reel capacity with your production requirements and expected changeover time.

Review The Production Line’s Key Equipment And Controls

Tension, resin placement, and UV exposure must work together to deliver reliable output. The system helps operators adjust settings to their cable design and fiber ribbon requirements.

Manage Fiber Tension, Resin Dispensing, And UV-LED Curing Together

Electro-pneumatic adjustment is used for each pay-off unit. Through the interface, operators set adhesive-dot spacing and counts while dispensers work individually or in linked groups.

Before UV-LED post-curing, three pre-curing ovens work with the mold groups. Verify resin compatibility and operating conditions with the supplier.

The Siemens PLC and touchscreen show lamp current and oven temperature, generate alarms, and support preset lengths. Before purchase, review cabinet requirements and power supply needs.

Stage Technical Specification Buyer check
Tension of fibers Pay-off: 0.4 to 2 N, ±0.02 N; capstan: 50 to 500 g, ±5 g accuracy Match settings to cable needs
Dispensing of resin Individually operated or linked units with adjustable adhesive-dot spacing and count Check interface configuration
Curing With UV-LED Three 800 W pre-curing ovens; one 6 kW post-curing oven; 395 nm ± 3 nm; at least 85% cure under stable, high-speed conditions Confirm resin compatibility
Monitoring Siemens S7-1200 or S7-1500 PLC; 10.4-inch touchscreen; real-time lamp current and oven temperature, alarms, preset lengths Verify cabinet and power supply requirements

Prepare Line Configuration, Installation, And Operating Conditions

Prepare a dedicated area before the equipment arrives. The optical fibre system requires an enclosed, clean, dry, and draft-free space. Keep the temperature from 15°C to 25°C, with humidity at or below 85%. Maintaining these conditions helps preserve equipment protection and operating precision.

With your facilities team, assess site utilities, available electrical capacity, cabinet space, and cable design. The system needs nitrogen supplied at 7 bar and 99.99% purity, together with compressed air at 6 bar. A three-phase, five-wire electrical supply rated 380 V ±10% is required.

  • Reserve room for the cabinet, components, resin, and access to service parts. Before starting the line, check the temperature settings and tension control.
  • Account for the specified reel size of Φ410 mm × Φ50.8 mm × 391 mm. The take-up unit accepts reels weighing up to 30 kg.
  • Include the main power feed-in cable in your site plan. The equipment package does not include connection cables and cable trays.

Before ordering, verify the supply scope, reel types, and installation requirements. Reviewing these items may reduce setup time and avoid subsequent delays. Request supplier confirmation of appropriate settings for your fiber and cable design, including lamp accuracy and operating conditions. Clear planning enables a smoother startup for the production system.

Request Pricing For A Ribbon Production Solution Tailored To Your Needs

Manufacturers seeking rollable 12- or 16-fiber formats can assess this line at its stated speed of 600 m/min. When requesting a quote, share your fiber layout, output goals, cable requirements, reel preference, and factory conditions.

Check the proposed system for its 16-spool pay-off, UV-LED curing setup, take-up capacity, and available options. Examine the supplied components, dispensing-head options, unit functions, and cable design prior to ordering.

Listed documents include operating and maintenance manuals, a general layout drawing, electrical schematics, and a wear-parts list. Reviewing these documents can clarify setup time and future service requirements.

For pricing and configuration details matched to your production plan and site utilities, consult Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. Verify the supply scope and replacement parts before purchase.